Welcome to the official Heathrow Video Library

Baggage Tunnel VNR

ID No: 694

Production Company: Tandem TV & Film Ltd

Production Date: 2009-03-03

Duration: 00:14:38

Views of the lowering of parts of the Tunnel Boring Machine into the pit for the cutting of the baggage tunnel between Terminal 5 and Terminal 3

Shot list
Airport Terminal Category Description
Heathrow Aerial View Aerial shots of Heathrow
Heathrow Aircraft Aircraft fly-through
Heathrow Control Tower Heathrow Control Tower aerial shot
Heathrow Construction Worksite GV's - construction
Heathrow Construction Cutting arm being lifted
Heathrow Construction Cutting arm being lowered into pit
Heathrow Construction Cutting arm being installed onto cutting head
Heathrow Construction TMB sled being lifted
Heathrow Construction Sled being lowered
Heathrow Construction Sled GV's
Heathrow Construction Timelapse: Cutting arm being installed
Heathrow Construction Timelapse: Cutting arm being lowered
Heathrow General worksite GV's